2,894
edits
m (Use Bonuses) |
m (change to V template) |
||
Line 1: | Line 1: | ||
{{ | {{V|0.14}} | ||
The gp rate, <math> R_{gp} </math> was calculated by finding the profit, <math> P </math> from performing 1 platebody smithing action, and dividing by the total time, <math> T_{tot} </math>, required to perform that action. Note that this is the per second rate, and must be multiplied by 3600 to obtain the hourly rate. | The gp rate, <math> R_{gp} </math> was calculated by finding the profit, <math> P </math> from performing 1 platebody smithing action, and dividing by the total time, <math> T_{tot} </math>, required to perform that action. Note that this is the per second rate, and must be multiplied by 3600 to obtain the hourly rate. | ||