Math:Dragon Platebodies: Difference between revisions

m
change to V template
m (Use Bonuses)
m (change to V template)
Line 1: Line 1:
{{V0.14}}
{{V|0.14}}
The gp rate, <math> R_{gp} </math> was calculated by finding the profit, <math> P </math> from performing 1 platebody smithing action, and dividing by the total time, <math> T_{tot} </math>, required to perform that action. Note that this is the per second rate, and must be multiplied by 3600 to obtain the hourly rate.
The gp rate, <math> R_{gp} </math> was calculated by finding the profit, <math> P </math> from performing 1 platebody smithing action, and dividing by the total time, <math> T_{tot} </math>, required to perform that action. Note that this is the per second rate, and must be multiplied by 3600 to obtain the hourly rate.